Road Widening

Road widening projects can involve all or some of the following construction steps:

  • Box out unsuitable shoulder material – this can be done very efficiently with profilers from 1m to 3m width
  • Backfill boxed out sections using either:
    • our Side Paver for widening widths of between 300mm and 1.5m
    • our bottom sliding semi trailer for widths greater than 1m.
  • Gravel material moisture conditioning using our in-situ stabilisers for widening widths greater than 2m or

Gravel stabilisation using our spreaders and in-situ stabilisers for width greater than 2m.