Road Profiling

Temporary holder for the Flash object

Although large civil projects provide a large part of WA Profiling’s business, of equal importance is our work for local shires and other road construction contractors.

WA Profiling has established contracts with several Perth shires and close relationships with several asphalt and civil contractors. This work can involve the removal of failing asphalt wearing courses, milling along kerb lines to retain the face of the kerb after asphalt overlays, milling tie-ins for asphalt overlays, and removal of entire road pavements for full road reconstructions.

Predominantly this work is performed in conjunction with new asphalt works and consequently profiling operations are time critical. Profiling must be completed in a timely manner so that the application of new asphalt can be completed and the road re-opened to traffic before the end of shift.

Break downs on this type of work are to be avoided at all costs. The WA Profiling fleet consists of new or near new machines that are at the forefront of technological advances in the road milling industry. Break downs are virtually unheard of on WA Profiling sites.